Monday, September 21, 2009

The Wiring Begins







I've started wiring the layout. The first task was to build a control "desk" to hold my Tech II power pack and Atlas block switches. This will be the third layout this equipment has served.

There's still some track to be laid in this section of the layout, but I've got enough in place to do some running. When I've tested the track I have so far, I'll continue laying more and install the turntable and roundhouse tracks. The turntable is scratchbuilt and served on my Idaho layout.

No comments:

Post a Comment